Open service contracts
Want an email when bids like these come out? Get free alerts for this search
Closing in the next 7 days
Remplacement d’un ponceau - Chemin des Faucons-Pélerins
Steveston (Paramount) Utility Dike Crossings, Richmond, BC
A contractor must install underground HDPE drainage casings at four locations in Richmond, BC, including electrical and waterline work, and complete the entire job by March 31, 2027.
Pavage d'un tronçon du boulevard Saint-Joseph
Rénovation des pavages et des clôtures de l'école Prévost
FireSmart Compound Rescon Roof Replacement, Jasper National Park
Parks Canada needs a contractor to replace two asphalt shingle roofs with metal roofing at a Compound in Jasper National Park. The work must be completed by February 1, 2027.
Construction d'une aire de chargement en bordure de la rue du Parc
Travaux d’aménagement dans le cadre du projet Grand parc urbain – Construction d’un chemin d’urgence et Correction du drainage
Alaska Highway Maintenance – North Section Km 589 to Km 968
The Alaska Highway North Section requires year-round snow removal, paving, and bridge repair services for a ten-year term starting June 1, 2028.
Official title: EZ011-270702 Alaska Highway Maintenance – North Section Km 589 to Km 968
Alaska Highway Maintenance – South Section Km 133 to Km 589
This contract requires a contractor to perform highway maintenance, paving, and snow removal services on the Alaska Highway for ten years, starting in June 2028.
Official title: EZ011-270701 ITQ Alaska Highway Maintenance – South Section Km 133 to Km 589
Asphalt Pavement Crack Sealing Services
Crack sealing on City of North Vancouver asphalt roads.
Closing in 8 to 14 days
Parking Lot and Paved Areas Recapitalization
This contract requires removing old asphalt, regrading the ground, and installing a new paved surface for a parking lot. The work must follow the National Building Code of Canada and be finished by March 31, 2027.
Sanitary and Storm Sewer Separation - Phase 4
The National Research Council Canada (NRC) requires a Contractor to complete the sanitary and storm sewer separation - Phase 4 located at 1200 Montreal Road, Ottawa, Ontario K1A 0R6.
Stage 2 - Lake Annette Retaining Wall Replacement, Jasper National Park
A contractor must replace a 110-meter retaining wall and pave a 2-meter pathway in Jasper National Park during Fall 2026 to restore safety and stability.
Services professionnels pour l’auscultation, l’évaluation et l’analyse de l’état des chaussées dans le cadre de l’élaboration d’un plan directeur de pavage
COOP Wharf Elevation Works at L'Étang-du-Nord Fishing Harbour, Magdalen Islands, Quebec
The Department of Fisheries and Oceans will pay for the demolition of wharves, excavation of the seabed, and installation of new timber crib wharves at the L'Étang-du-Nord Fishing Harbour.
Closing later
Travaux de réparation de pavage à la main et à la niveleuse pour l'année 2027
SITE WORK – including but not limited to concrete paving, asphalt paving, asphalt line painting, play equipment, fitness equipment, pickleball court equipment…
RFT 5908344515 on the Toronto Bids Portal. For Parks, Forestry & Recreation.
Douglas Street Watermain and Transportation Works
Watermain replacement and road works along Douglas Street in Victoria (RFP 26-099).
Travaux d'infrastructures souterraines 2027, réhabilitation par chemisage des conduites d'égouts sur diverses rues de la Ville de Laval
Transportation and Economic Corridors - Request for Proposal - CON0025816 and CON0025817 Engineering Consultant Services for Asphalt and Concrete Pavement and Other Work for HWY 43:08, HWY 49:12, HWY 43:10, and HWY 43:12
You will provide engineering and pavement consulting services for Highway 43 and 49 in Alberta. The work runs for a single project lasting one year.
APN - NORAD Northern Basing Infrastructure (NNBI), NWT
Design-builders must secure SECRET-level security clearance to bid on $5B+ multi-year infrastructure projects for NORAD's Inuvik and Yellowknife facilities.