Open contracts
Want an email when bids like these come out? Get free alerts for this search
Closing in the next 7 days
Modernisation ascenseur
Rénovation des ascenseurs RL1 et RL2 aux résidences René-Lévesque (RL)
Remplacement d’un ponceau - Chemin des Faucons-Pélerins
Modernisation ascenseur, École Saint-Coeur de Marie, Rivière à Pierre
Pavage d'un tronçon du boulevard Saint-Joseph
Rénovation des pavages et des clôtures de l'école Prévost
Sir Frederick Banting Building Fire Alarm System Improvements
The project replaces the building's fire alarm system with a new networked system to ensure safety during construction without stopping operations.
Official title: EP076-270289 Sir Frederick Banting Building Fire Alarm System Improvements
FireSmart Compound Rescon Roof Replacement, Jasper National Park
Parks Canada needs a contractor to replace two asphalt shingle roofs with metal roofing at a Compound in Jasper National Park. The work must be completed by February 1, 2027.
Pour le scellement de fissures
Construction d'une aire de chargement en bordure de la rue du Parc
Vertical Transportation Maintenance Services
Elevator and escalator maintenance at Simon Fraser University.
Official title: Vertical Transportation Maintenance Services - Request for Proposals
Travaux d’aménagement dans le cadre du projet Grand parc urbain – Construction d’un chemin d’urgence et Correction du drainage
Alaska Highway Maintenance – North Section Km 589 to Km 968
The Alaska Highway North Section requires year-round snow removal, paving, and bridge repair services for a ten-year term starting June 1, 2028.
Official title: EZ011-270702 Alaska Highway Maintenance – North Section Km 589 to Km 968
Alaska Highway Maintenance – South Section Km 133 to Km 589
This contract requires a contractor to perform highway maintenance, paving, and snow removal services on the Alaska Highway for ten years, starting in June 2028.
Official title: EZ011-270701 ITQ Alaska Highway Maintenance – South Section Km 133 to Km 589
Asphalt Pavement Crack Sealing Services
Crack sealing on City of North Vancouver asphalt roads.
Closing in 8 to 14 days
Parking Lot and Paved Areas Recapitalization
This contract requires removing old asphalt, regrading the ground, and installing a new paved surface for a parking lot. The work must follow the National Building Code of Canada and be finished by March 31, 2027.
Modernisation de l'ascenseur, travaux de drainage, accessibilité universelle et mise aux normes d'une mezzanine | École Paul-Germain-Ostiguy
Modernisation de l’ascenseur nº 4 du Centre d’hébergement Paul-Émile_Léger
Sanitary and Storm Sewer Separation - Phase 4
The National Research Council Canada (NRC) requires a Contractor to complete the sanitary and storm sewer separation - Phase 4 located at 1200 Montreal Road, Ottawa, Ontario K1A 0R6.
Stage 2 - Lake Annette Retaining Wall Replacement, Jasper National Park
A contractor must replace a 110-meter retaining wall and pave a 2-meter pathway in Jasper National Park during Fall 2026 to restore safety and stability.
Services professionnels pour l’auscultation, l’évaluation et l’analyse de l’état des chaussées dans le cadre de l’élaboration d’un plan directeur de pavage
COOP Wharf Elevation Works at L'Étang-du-Nord Fishing Harbour, Magdalen Islands, Quebec
The Department of Fisheries and Oceans will pay for the demolition of wharves, excavation of the seabed, and installation of new timber crib wharves at the L'Étang-du-Nord Fishing Harbour.