Pathway Remediation, Additional Scope of Work (Project No. 26-07114)
Repairs to campus pathways at the University of Victoria (additional scope, project 26-07114).
Want an email when bids like these come out? Get free alerts for this search
Repairs to campus pathways at the University of Victoria (additional scope, project 26-07114).
You must supply and install roofing and vinyl siding at a Staff house in Ingonish, Nova Scotia, by March 31, 2027.
This project involves installing 35 backflow preventers at AAFC's Beaverlodge Research Farm to ensure water safety. The work is scheduled for March 31, 2027, and requires a site visit on the AAFC property.
This contract involves rebuilding a main hatchery building, electrical upgrades, and installing lab equipment at the DFO Capilano River Hatchery in North Vancouver.
Official title: EZ899-270544 – Phase 1 - DFO Capilano Hatchery Building Rebuild
A fire alarm system upgrade for the Sir Frederick Banting Building will replace existing equipment with a new networked system while keeping the lab and office open.
Official title: EP076-270289 Sir Frederick Banting Building Fire Alarm System Improvements
Parks Canada needs two roof replacements at a Jasper National Park compound by February 1, 2027. The work involves installing standing seam metal roofs on existing asphalt shingle roofs.
Renovation of the steam room at Gordon Head Recreation Centre in Saanich.
Official title: RFQ 26-215 - Steam Room Renovation - Gordon Head Recreation Centre
Elevator and escalator maintenance at Simon Fraser University.
Official title: Vertical Transportation Maintenance Services - Request for Proposals
The Alaska Highway North Section requires year-round and seasonal maintenance from June 1, 2028, for a ten-year term.
Official title: EZ011-270702 Alaska Highway Maintenance – North Section Km 589 to Km 968
Phase 3 mechanical and electrical upgrades to the University Club building at UVic (project 26-07179).
Official title: RFT 485 - PH 3 University Club - Mechanical and Electrical Upgrades
Crack sealing on City of North Vancouver asphalt roads.
This contract requires a contractor to perform highway maintenance, paving, and resurfacing services on the Alaska Highway South Section from 2028 to 2038.
Official title: EZ011-270701 ITQ Alaska Highway Maintenance – South Section Km 133 to Km 589
This contract requires asphalt removal, grading, drainage upgrades, and new paving for a parking lot. The work must be completed by March 31, 2027.
You must replace aging Reverse Osmosis water systems at AAFC's Summerland Research Centre in British Columbia with new Type II systems, upgrade piping, and handle all electrical work by March 31, 2027.
Transport Canada needs an administrator to run the airport's runways, buildings, and parking lots from April 1, 2027, to March 31, 2028, with an option to extend the contract for up to two years.
Clean-up and repairs after a sewage problem at a Fraser Health site in Langley.
Official title: K120-00 Langley PPH Sewage Remediation
The National Research Council Canada (NRC) requires a Contractor to complete the sanitary and storm sewer separation - Phase 4 located at 1200 Montreal Road, Ottawa, Ontario K1A 0R6.
A contractor must replace a 110-meter retaining wall and pave a 2-meter pathway in Jasper National Park during Fall 2026. The work involves masonry, excavation, and asphalt repair, with vegetation restoration handled separately.
Remove the existing boiler in Building 120 at VIU's Nanaimo campus and supply and install a new one.
Official title: RFT 2026-5199 VIU Building 120 Boiler Replacement
Mechanical contractor to renew sanitary drain piping in a building at Royal Jubilee Hospital, Victoria.
Road Crack Sealing Services
RFT 5908344515 on the Toronto Bids Portal. For Parks, Forestry & Recreation.
The City of Victoria is building a roster of plumbers for routine maintenance and repairs on City buildings (RFP 26-102).
Watermain replacement and road works along Douglas Street in Victoria (RFP 26-099).
You will provide engineering and pavement consulting services for Highway 43 and 49 in Alberta. The work runs for a single project lasting one year.