Pottery Studio Ventilation - Cedar Hill Recreation Centre
A general contractor must install local exhaust ventilation in the Clay Storage Room at the Cedar Hill Recreation Centre in Saanich.
Want an email when bids like these come out? Get free alerts for this search
A general contractor must install local exhaust ventilation in the Clay Storage Room at the Cedar Hill Recreation Centre in Saanich.
BDC Academy needs a new Learning Experience and Cohort Management Platform to replace its current system.
Official title: 343 044 010 - École Victor Doré - Installation et mise en marche d'un système de CVAC (Climatisation) - Phase 2
Defence Construction Canada will install a 300kW solar microgrid and diesel generators at 14 Wing Greenwood, NS, with a total cost of $15.8M over 567 calendar days.
Design-Build teams must submit proposals to design and construct the Camp Sustain Theatre Coordination Center at 5th Canadian Division Support Base in Gagetown, New Brunswick for $29.5 million.
This project requires a contractor to install, repair, and replace safety ladders at Owen Sound Harbour. The work will take place in Grey County, Ontario, and runs for a single one-time job.
Official title: EQ754-270525 - Repair, Construct and Replace Safety Ladders at Owen Sound Harbour - Owen Sound, ON
PSPC on behalf of DND has a requirement for the the supply of all labour, materials, tools, equipment, transportation and supervision necessary to carry out Repair, Replace/Refurbish Refractory and Brickwork in Boilers at 4 Wing Cold Lake.
Official title: W6895-260403 - Boiler Refractory Repair Services at Cold Lake Alberta
RFP 5897259877 on the Toronto Bids Portal. For Solid Waste Management Services.
RFT 5885770515 on the Toronto Bids Portal. For Corporate Real Estate Management.
Official title: CI32 - Construction des structures auxiliaires SA1, SA2 et SA3
Open & Competitive Opportunity | Invitation to Bid | Infrastructure | ----- | APC Reference #AB-2026-07232 / Internal Reference #661466 | Construction | Closing on Thu Nov 19, 2026 at 2:00 PM (MT) | Alberta | View full posting on APC
Edmonton Remand Centre needs new resilient flooring installed in Edmonton. The work will take about 3 weeks to complete.