Open contracts
Want an email when bids like these come out? Get free alerts for this search
Closing later
Espaces verts - St-Nom-de-Marie au Lac Ste-Marie, St-Joseph à Gracefield et Ste-Thérèse à Cayamant
Espaces verts - Poupore et Centre Pontiac à Fort-Coulonge et Notre-Dame-du-Sacré-Coeur à l'Isle-aux-Allumettes
Espaces verts - Reine-Perreault à Blue Sea, Notre-Dame-de-Grâce à Bouchette et Ste-Croix à Messines
Espaces verts - St-Boniface à Bois-Franc, Dominique-Savio à Montcerf-Lytton et Sacré-coeur de Grand-Remous
Espaces verts - Écoles primaire et secondaire sacré-coeur de Gracefield
Espaces verts - Cité étudiante de la Haute-Gatineau
Espaces verts - Christ-Roi, CFER et Académie à Maniwaki
Espaces verts - École secondaire Sieur-de-Coulonge à Mansfield et Pontefract
Espaces verts - Pie XII et Centre administratif à Maniwaki et St-Eugène à Déléage
Replacement of HVAC Units, Springhill Institution, NS
Springhill Institution, Nova Scotia, requires HVAC and ventilation upgrades for five buildings. The work runs for 150 weeks and includes mechanical, electrical, and control services.
Official title: EC016-270821 ITQ- Replacement of HVAC Units, Springhill Institution, NS
Stream 2.11 Information/Record Management/Recordkeeping Specialists
This work involves providing expert advice and database management for the National Capital Region of Canada under the Access to Information Act.
Learning Experience & Cohort Management Platform
BDC Academy needs a new Learning Experience and Cohort Management Platform to replace its current system.
GWD - Install Solar Microgrid, 14 Wing Greenwood, NS
Defence Construction Canada will install a 300kW solar microgrid and diesel generators at 14 Wing Greenwood, NS, with a total cost of $15.8M over 567 calendar days.
MDB- CAMP SUSTAIN THEATRE TRAINING COORDINATION CENTRE (CS TTCC)
Design-Build teams must submit proposals to design and construct the Camp Sustain Theatre Coordination Center at 5th Canadian Division Support Base in Gagetown, New Brunswick for $29.5 million.
Tonte de pelouses
Fourniture, plantation, entretien des fleurs annuelles en bacs et massifs – 2 années avec option d’un an
Dufferin Transfer Station Electrical Upgrade & RNG New Power Feeder, as further described in Part 3 (Requirements for Deliverables) in Ariba
RFP 5897259877 on the Toronto Bids Portal. For Solid Waste Management Services.
SITE WORK – including but not limited to concrete paving, asphalt paving, asphalt line painting, play equipment, fitness equipment, pickleball court equipment…
RFT 5908344515 on the Toronto Bids Portal. For Parks, Forestry & Recreation.
Alaska Highway Maintenance – North Section Km 589 to Km 968
The Alaska Highway North Section requires year-round snow removal, paving, and bridge repair services for a ten-year term starting June 1, 2028.
Official title: EZ011-270702 Alaska Highway Maintenance – North Section Km 589 to Km 968
Maplelawn Garden Wall Rehabilitation
The Ottawa NCC needs qualified contractors to rebuild historic garden walls at 529 Richmond Rd, Ottawa, using concrete and mortar. The work involves demolition, wall covering, and masonry services and will take several days to complete.
Forestry and Parks - Request for Proposal - FireSmart Vegetation Management Activities - Elkwater (Cypress Hills Provincial Park)
Open & Competitive Opportunity | Request for Proposal | Forestry and Parks | ----- | APC Reference #AB-2026-07241 / Internal Reference #27TDRPAR655 | Services | Closing on Thu Nov 19, 2026 at 2:00 PM (MT) | Alberta | View full posting on APC
Saanich Peninsula Wastewater Treatment Plant Tank Structure Repairs
Concrete and structural repairs to tanks at the Saanich Peninsula wastewater treatment plant.
Alaska Highway Maintenance – South Section Km 133 to Km 589
This contract requires a contractor to maintain the Alaska Highway South Section from Km 133 to Km 589 for ten years, including snow removal, paving, and bridge repair services.
Official title: EZ011-270701 ITQ Alaska Highway Maintenance – South Section Km 133 to Km 589
Of Sanitary Sewer Drain Pipe at Northern Forestry Centre, Edmonton
This project involves repairing and installing new sewer pipes inside a concrete floor at the Northern Forestry Centre in Edmonton. The work will take about 30 weeks to complete.
Official title: EW038-270871-Phase 2-ITT-Construction of Sanitary Sewer Drain Pipe at Northern Forestry Centre, Edmonton