Also called: environmental site assessment, phase I ESA, phase II ESA, contaminated sites, environmental monitoring, water sampling, laboratory analysis, hazardous materials assessment
Public bodies need environmental consultants and labs whenever they buy, sell, build on or clean up land, and to prove their water, air and soil meet the rules. Municipalities, utilities, school districts and federal departments put site assessments, sampling programs and lab testing out to tender every year.
Who buys environmental consulting and testing?
- Municipalities and regional districts, for drinking water and wastewater testing, landfill monitoring and site assessments before land deals.
- School districts, health authorities and housing providers, for hazardous materials surveys before renovations and demolitions.
- Utilities and crown corporations, for environmental monitoring around dams, lines and facilities.
- Federal departments, for contaminated sites on federal land and environmental effects monitoring.
What does the work include?
Phase I and phase II environmental site assessments, soil, groundwater and surface water sampling, drinking water and wastewater lab analysis, hazardous materials surveys for asbestos, lead and mould, environmental monitoring during construction, and reports that meet the province's contaminated sites rules.
How is it priced?
Assessments and surveys are usually a fixed price per site with unit rates for extra samples. Sampling programs and lab work are priced per sample or per test from a schedule of rates, often on a multi-year contract with estimated quantities.
What do you need to bid?
Qualified professionals (often a professional engineer, geoscientist or agrologist sign the reports), a lab accredited for the tests in scope, chain of custody procedures, turnaround times, and professional liability insurance. Some provincial work needs a contaminated sites approved professional to sign off.
When do these tenders come out?
Sampling and lab contracts come up when their term ends, often for a January start. Site assessments follow land purchases, rezoning and capital projects, and hazardous materials surveys come before summer construction.
See engineering and architecture and asbestos abatement for related work.